- GOST R 70750-2023 (Rosstandart order No. 493-st of 10.07.2023)
- Annex A - template statement-of-work form
- Annex V - equipment requirements
- RD EO 0570-2004 - for nuclear-plant hydraulic structures
Underwater-technical survey of hydroelectric-plant structures
GOST R 70750-2023 sets the standards, the equipment requirements and a template statement-of-work form for hydroelectric-plant structures. PROMETEY is engineered to meet these requirements.
The standard is titled, literally, “Hydroelectric power plants. Hydraulic engineering structures. Underwater-technical survey…”. In it, Annex A is the template statement-of-work form, Annex V the equipment requirements, and clause 5.2 the timing and frequency.
What PROMETEY inspects
Hydropower means the harshest conditions. The key parameter is the permissible current in the head/tail race (clarified per site). Contact inspection and repair remain a diver's job.
Does the vehicle comply with Annex V of GOST R 70750-2023?
We prepare a line-by-line compliance table against the standard for your specific site: which clauses an ROV survey covers and which require a diver or other methods.
Does it work during a water release?
We operate in currents up to roughly 2 knots; beyond that, station-keeping accuracy drops - assessed per site.
Describe your underwater site - we'll scope it
Type of structure, depth, current, visibility, what needs to be found. We'll send a configuration and a quote.